Technical specification for 1 hours backup(1C)
MODEL | 30KW-100KWH | 50KW-100KWH | 50KW-112KWH | 50KW-125KWH | 50KW-140KWH | 50KW-241KWH |
DC(Battery) | ||||||
Cells Type | LiFePO4 Lithium Iron Phosphate | |||||
Cell specfication | 3.2V280Ah | 3.2V280Ah | 3.2V280Ah | 3.2V280Ah | 3.2V306Ah | 3.2V314Ah |
Configuration of Battery | 112S1P | 112S1P | 112S1P | 140S1P | 140S1P | 240S1P |
Single Battery Pack | 51.2V280AH/14.336kWh | 64V280AH/17.920kWh | 64V306AH/19.584kWh | 64V314AH/20.09kWh | ||
Battery Module | 7 Packs | 7 Packs | 7 Packs | 7 Packs | 7 Packs | 12 Packs |
Battery Capacity | 100kWh | 100kWh | 112kWh | 125kWh | 137kWh | 241kWh |
Max. Power | 30KW | 50KW | 50KW | 50KW | 50KW | 50KW |
Max. Current | 140A | 140A | 140A | 140A | 152A | 157A |
Battery Rated Voltage | 358.4V | 358.4V | 358.4V | 448V | 448V | 768V |
Battery Voltage Range | 313.6V-403.2V | 313.6V-403.2V | 313.6V-403.2V | 392V-504V | 392V-504V | 672V-876V |
AC(On / Off Grid) | ||||||
Max. Power(kVA) | 33KVA | 55KVA | 55KVA | |||
Active Power(kW) | 30KW | 50KW | 50KW | |||
Rated Voltage(V) | 400V | 400V | 400V | |||
Rated Current(A) | 43A | 86A | 86A | |||
Voltage Range | 320V-460V | 320V-460V | ||||
Rated Frequency | 50/60Hz | 50/60Hz | ||||
Range of Frequency | 45-55/55-65Hz | 45-55/55-65Hz | ||||
THDI | <3% | <3% | ||||
Power factor | 1.0(Adjustable from 0.8 leading to 0.8 lagging) | 1.0(Adjustable from 0.8 leading to 0.8 lagging) | ||||
AC System | 3 phase 4 wires | 3 phase 4 wires | ||||
Overload capability | 110% | 110% | ||||
Solar Side(PV) | Optional | |||||
Max. Power | 100KW(30KW*2) | |||||
High Volage side Voltage | 560V-1000V | |||||
High Voltage side Current | 80A | |||||
Low Voltage side Voltage | 500V-900V | |||||
Low Voltage side Voltage | 100A | |||||
Uninterrupted Load(STS)) | Optional | |||||
STS Power | 50KW | |||||
STS Voltage | 400V 50HZ/60HZ | |||||
Overload Power | 110% | |||||
Shift Time | <20mS | |||||
System operation stratege | ||||||
Functional | Anti Backflow and Black Start | |||||
Operation Mode Selections | Power peak shaving and valley filling, electricity price peak valley arbitrage, | |||||
photovoltaic priority for electricity cost savings, | ||||||
wind power generation priority for electricity cost savings, off grid power supply for remote areas | ||||||
Scenerios | Photovaltaic and diesel storage project, Wind power and diesel storage project, Wind and photovoltaic | |||||
diesel storage project, Charging Station + Energy storage project, On-grid electricity selling project | ||||||
Specificaiton | ||||||
Cabinet Size(W*D*H) | 1696/1408/2055mm | |||||
Weight | ≤2.7 T | |||||
Max. cycle efficiency | ≥90% | |||||
IP rating | IP55 | |||||
Auxiliary Power Supply | Self-powered, Externally powered | |||||
Corrosion resistance rating | C3/C5 | |||||
Operating Humidity Range | 0%-100%(Non-condensing) | |||||
Operating Temperature | -30℃-50℃(>45℃ derating) | |||||
Max. Operation Altitude | 2000m | |||||
Communication | Ethernet、485、CAN | |||||
Communication Protocal | ModbusTCP | |||||
Cooling method | Intelligency Air cooling | |||||
Fire safety configuration | Smoke detector, Heat detector, Gas-based fire extinguishing system, | |||||
Pressure relief valve, Pack-level fire protection, Cluster-level fire protection, | ||||||
Water-based fire protection, Automoatic pressure relief | ||||||
MPPT Optional: According to the actual demand |
No.18, Yucai Road, Dalingshan Town,Dongguan,Guangdong,China.
info@yuyangenergy.com
+86 13580815859
13580815859
©2024 Copyright | Shenzhen Yuyang New Energy Co.,Ltd | All Rights Reserved
No compromise on quality, more favorable prices, creating more benefits for you.